Consulting |
After defining requirements for the plant, this step contains valuable information package for design & development. Pi Automation attend several meetings with project manager. |
Design & Development |
On this section of the project study, Pi Automation creates all project engineering, hardware,software,documentation and totally tailor-made solution for commissioning. |
Production & Installation |
This stage covers production and installation of all mechanical and electronic components in the production field regarding system requirements. |
Commissioning |
Commissioning of all mechanical and electronic hardware and software are managed in this step including function test, field check-out and necessary surveys to be ready for temporary production. |
Training |
Pi Automation manage training for operator(s) and manager(s) for all key-point on commissioned system. |
Service & Maintenance |
Yukarıda belirtilen adımlar tamamlandıktan sonra devreye alınan tesisin zaman içinde yıpranma payını azaltmak, uzun yıllar verimli ve etkin kullanımını sağlamak amacı ile sistemin bütün bileşenlerinin periyodik olarak kontrolünü içeren süreçtir. |